Summary:

MOR Environmental provided technical advice to Ibrook Ltd between 2012 and 2018, regarding the former Waterford Crystal Factory. In acquiring the site, Ibrook became the holders of IPPC Licence PO157-02. The key objective was to undertake the necessary works to satisfy the EPA to allow this licence that related to past activities to be surrendered.

Scope:

The works were carried out in several phases and comprised the following;

  • Design and implementation of a quarterly groundwater and surface water monitoring programme between 2012 and 2017. 
  • Intrusive investigations that included the installation of additional onsite and offsite groundwater monitoring wells between 2013 and 2016. 
  • Completion of a Detailed Quantitative Risk Assessment (DQRA) including P20 modelling in 2013.
  • Hydro-geochemical modelling using the PHREEQC modelling tool in 2014.
  • Additional soil sampling in 2016. 
  • Hydrogeological Validation Report in 2016.
  • Preparation of an Independent Closure Audit Report. 

Outputs:  

All works were completed to the satisfaction of the EPA who formally surrendered IPPC licence P0157-02 in 2018.